Recent questions tagged design-and-build

7 votes
0 answers 8 views
To what precision extends and accuracy requirements in the data collection and reconnaissance survey supposed to be conducted by the bridge designer in design and build project?
asked May 2 in Structure TanCK 39,780 points
12 votes
1 answer 220 views
The contractor failed to submit the 5% Design Bon upon the issuance of the CPC for a DB contract. After a few warnings, the S.O decided to claim the Performance Bon of the contract which is also equivalent to 5% of the CSum.What if the balance of money due is insufficient to cover the defects for the works?Is there any other options available to the S.O?
asked Nov 17, 2013 in Civil norshimah 6,490 points