Recent questions and answers in Civil

3 votes
0 answers 14 views
Jadual Kadar Harga bagi kerja-kerja sivil yang terkini tahun berapa? Adakah 2018? Sebab Jabatan Pendidikan Negeri ada yang JKH 2018 tapi hasil semakan cuma yang draf sahaja. Mohon bantuan pencerahan.
asked Mar 15 in Civil zylina1910 880 points 7 18
3 votes
1 answer 31 views
Salam... mohon bantuan rakan-rakan untuk share contoh format dokumen CSA perunding ukur tanah berdasarkan fix fee..tq
answered Feb 14 in Civil shahairulsairi 4,130 points 3 14 29
22 votes
1 answer 96 views
Kita menjalankan lab. soil compaction. We plot the dry density vs moisture content graph. From there we determine the optimum moisture content that gives the highest dry density value. Katakan after doing the lab. test, the optimum moisture content is 5%. Questions) ... , according to the dry density vs moisture content graph, the dry density value will drop. (اللهمّ يسر و لا تعسر)
answered May 7, 2018 in Civil FizuL 8,070 points 10 17 37
23 votes
2 answers 56 views
Q-lassic telah diperkenalkan oleh CIDB dalam membantu menjaga kualiti dan workmanship sesebuah projek bangunan, adakah projek-projek bangunan juga mengambil Q-lassic sebagai syarat dalam kontrak pembinaan?
answered Feb 13, 2018 in Civil khudri 24,610 points 38 94 187
15 votes
4 answers 80 views
11 votes
2 answers 118 views
Kontraktor telah tidak menunjukan prestasi yang memberangsangkan hampir 10 bulan.
answered Jun 10, 2017 in Civil KHAIRUL AMIRUL 17,970 points 26 67 121
14 votes
1 answer 44 views
Apa pendapat tuan/puan adakah penggunaan UHPC adalah penting dan mempunyai kebaikan? Jika ada apa kebaikannya dan adakah wajar ia digunakan secara meluas masa kini? Jika tidak , apakah keburukannya pula?
answered Mar 4, 2016 in Civil TanCK 47,270 points 106 189 336
12 votes
3 answers 182 views
To determine piling point di atas tanah, untuk membina bangunan is easy. But how to determine piling point di dalam sungai untuk membina jambatan kecil. Bukan jambatan besar seperti Penang Bridge. Jambatan besar semua peralatan survey canggih canggih belaka. Lets say a RM20 million bridge. (اللهمّ يسر و لا تعسر)
answered Feb 26, 2016 in Civil TanCK 47,270 points 106 189 336
16 votes
1 answer 204 views
Melalui perhatian saya masih ramai kakitangan/pegawai kerajaan yang keliru untuk melabelkan sesuatu projek dikategorikan sebagai "Projek Sakit" sebagaimana digariskan di dalam SPP. Melalui ruangan ini, diharap mendapat pencerahan mengenainya. Kalau boleh tolong berikan contoh-contoh pengiraan berdasarkan kepada Jadual Kerja S-Curve.
answered Jul 12, 2015 in Civil khairilhizar 46,360 points 33 87 168
22 votes
2 answers 157 views
Construction industry is realizing the plans and specifications for the physical structure. The project is success when it is completed to meet client needs without any issues and problems in terms of time, quality and budget allocation. The budget allocation is important ... , the question is what are the cause and impact of dispute and delay the closing of final account in construction project.
answered Jul 7, 2015 in Civil harjit 7,600 points 12 29 53
23 votes
4 answers 143 views
12 votes
5 answers 728 views
Saya bertugas di Tribunal Tuntutan Pembeli Rumah, apabila pemeriksaan ke atas premis seringkali dilihat masalah keretakan pada plaster dinding selalunya menjadi isu utama kepada pembeli rumah yang mengatakan rumah mereka telah retak. Oleh itu saya hendak bertanya kaedah terbaik untuk menyelesaikan masalah ini?
answered May 7, 2015 in Civil zainalma 11,030 points 14 36 70
16 votes
1 answer 54 views
The fundamental principle of project development is that the basic contract for the entire project is still implemented based on the conventional system (203, 203A). Is there any possibility for JKR to develop the Islamic law of contract?
answered Apr 16, 2015 in Civil FaizS 19,740 points 15 50 128
13 votes
1 answer 103 views
Pada kebiasaanya, kegagalan melakukan koordinasi pada peringkat rekabentuk akan menyebabkan kesukaran pada wakil JKR di tapak projek melakukan kerja-kerja pengawasan projek dan membuat keputusan yang melibatkan perubahan rekabentuk. Dalam kes ini, lukisan rekabentuk ... S.O apabila mendapati terdapat column berada di tengah-tengah koridor kecil di peringkat akhir pembinaan struktur konkrit?
answered Mar 22, 2015 in Civil abubakarms 10,950 points 9 43 89
12 votes
1 answer 88 views
Bayaran imbuhbalik gaji cow perunding bolehkah dibayar 1/2 bulan dan 1/2 bulan. perkara ini berlaku selepas perunding menuntut gaji cow bulam mac 1/2 bulan, bulan april dan mei perunding tuntut penuh sebulan. Apabila ditanya perunding menjawab akan tuntut kemudian dan sila teruskan bayaran mengikut invoice yg dikemukakan.
answered Oct 20, 2014 in Civil wmazam 190 points 2
15 votes
1 answer 169 views
answered Jun 13, 2014 in Civil Mohd Fairuz 27,310 points 73 156 199
15 votes
1 answer 62 views
10 votes
1 answer 70 views
bagaimana kami di jkr negeri mahu memuat turun spesifikasi yg kadangkala diarahkan untuk digunapakai melalui arahan kpkr? saya mencuba untuk mengakses laman web ckjg tetapi gagal. mohon bantuan
answered May 14, 2014 in Civil ystou 1,220 points 1 6 12
15 votes
1 answer 114 views
Data: Ketinggian embankment pada bridge approach antara 7 meter hingga 8 meter Abutment disokong oleh cerucuk. Pile slab -- untuk approach embankment
answered May 9, 2014 in Civil noorazmanr 14,890 points 12 50 137
12 votes
1 answer 126 views
Projek Persekutuan dimana Pengurus Program adalah JKR (SBU), kemudian Projek tersebut diserahkan kepada JKR Sarawak (bukan entiti JKR Malaysia) sebagai Pegawai Penguasa, Adakah JKR Sarawak perlu mematuhi Pekeliling KPKR atau Terlakluk pada Pekeliling mereka sendiri? Bagaimanakah sekiranya mereka memilih untuk tidak mengikut pekeliling KPKR? Mohon bantuan QS / Sesiapa yang berpengalaman.
answered Apr 18, 2014 in Civil farijal 42,700 points 28 107 204
13 votes
1 answer 71 views
can anyone tell me how to make a faux finishing for wall. i have seen wall which has a stone finishing though it was initially just some plain cement structure. thank you
answered Apr 10, 2014 in Civil Rosli 8,130 points 25 56 91
11 votes
3 answers 92 views
In situations where we have a water retention / detention pond in an area where the slopes have a very high sand content, what would be the best method of ensuring the slope does not fail during times of high water level or high surface runoff over the slopes into the pond.
answered Apr 5, 2014 in Civil nikmanan 23,840 points 32 79 152
9 votes
2 answers 155 views
Projek berskala kecil dgn kos RM 350k sahaja. Dilaksanakan oleh ICU Negeri Selangor, SO dan project team adalah pegawai kader JKR. Tindakan terkini, (Verbally) SO tdk setuju dan minta kontraktor kemukakan cadangan kerja terlebih dahulu utk semakan ... sahaja. Kontraktor still mahu brickworks dipasang dahulu memndangkan tempoh projek yg singkat. Mohon pandangan teknikal dan pentadbiran kontrak.
answered Mar 11, 2014 in Civil harjit 7,600 points 12 29 53