menu
Portal JCoP Café
Login
Register
search
Log In
account_circle
Log In
Email or Username
Password
Remember
Log In
I forgot my password
Register
Username
Email
Password
Register
Home
Questions
Hot!
Unanswered
Tags
Categories
Users
Ask a Question
Rules
Related questions
What is the allowable buffer distant for dredging work at both upstream and downstream of a bridge?
Is it normal for the strength of concrete at 7 days to be way above the design strength ?
Why don't JKR cooperate with Waze to provide information to the road user especially on speed limit, heavy vehicle weight limit? Thus, it can also helps us to provide information of pothole (for example).
Can the Project Director issue CPC for a D & B project that has been practically completed but contractor has failed to obtain the Design Gurantee Bond as per CoC?
i just want to know, bend test is one method for evaluating ductility, but WHY it cannot be considered as a quantitative means of predicting service performance in bending operations?
Most popular tags
project-management
stakeholder
facilities-asset-management
risk-management
stakeholder-management
bim
project
pengurusan-aset-fasiliti
design
asset
pengurusan-projek
human-resource
electrical
time-management
jalan
spesifikasi
pengurusan-kontrak
structure-design
competency
rekabentuk
Categories
All categories
Project Management
(417)
Human Resource Management
(326)
Assets & Facilities Management
(314)
Stakeholders Management
(151)
Technical & Contract Admin
(651)
Architecture
(42)
Civil
(47)
Structure
(31)
Road
(123)
Bridge
(18)
Building
(41)
Mechanical
(28)
Electrical
(110)
Forensic
(3)
Geotechnical
(26)
Infrastructure
(1)
Contract Administration
(110)
Miscellaneous
(22)
Structure
(91)
BIM
(39)
Green
(38)
Contract Management
(120)
ICT
(18)
Miscellaneous
(46)
Helpdesk
(69)
Moderator (Special)
(2)
What is the tolerable differential settlement at bridge approach as per designed speed is deemed to be safe for road users?
4
votes
27
views
What is the tolerable differential settlement at bridge approach as per designed speed is deemed to be safe for road users?
road-project
asked
Jan 23, 2020
in
Bridge
TanCK
49,180
points
●
107
●
197
●
357
answer
Please
log in
or
register
to answer this question.
1
Answer
1
vote
Sir,
The allowable differential settlement at bridge approach at the point of connecting the structure and embankment is zero. The allowable settlement at approach bridge embankment is however is at the rate of 1:500. Which means that the allowable maximum settlement is of 100mm within the 50m range from bridge abutment.
Thank you.
fairul
answered
Feb 5, 2020
fairul
1,070
points
●
1
●
6
●
9
ask related question
comment
1
Thank you. But a settlement depth of 100mm will be a big impact to the motorist in term of the kink effect, in this case the safety of the road users will eventually at risk.
1
Sir,
No such kink effect will occur. It is a gradual settlement and 100mm is max settlement at the point between toe of embankment and incoming road. Settlement on road has greater rate value with maximum total settlement of 250mm after 5 years post-construction.
1
Sir,
But many occasion the settlement happened at the bridge approaches will have the kink effect especially right after the ballast wall. In this situation impact from the kink effect will be a risk to all motorist if the the drop is >100mm.
0
During many of my road trips, I'm quite sure I've encountered with bridge's approaches which do not satisfy to this settlement requirements, especially to newly constructed bridges. Is it due to problems in design, material or construction.?
0
Most of the cases were of construction issue caused by poor compaction.