En Meor,
Saya tidak bercadang untuk bercerita detail berkenaan BIM. Herewith, saya sertakan beberapa key attributes yang diperolehi daripada BIM antaranya;
1. robust geometry where objects are described by faithful and accurate that is measurable
2. Integrated information where the model holds all information in a single repository to ensure consistency, accuracy and accessibility of data
3. lifecycle support where the model definition supports data over the complete facility lifecycle from planning to demolition. For example, client requirements data such as room areas or environmental performance can be compared with as-designed, as-built or as performing data. This is a vital for FM.
For you info, lifecycle data,.... requirement, design, construction and operational information can be used in FM.
Just sharing knowledge.
Terimakasih