search
Log In

Recent questions tagged design

16 votes
1 answer 92 views
asked May 9, 2014 in Project Management SarumZA 10,190 points 33 70 108
21 votes
2 answers 111 views
Di mana boleh diperolehi data bagi Life Cycle Costing berkaitan industri binaan bagi membolehkan LCC diambilkira dalam rekabentuk dengan lebih efektif?
asked Apr 14, 2014 in Assets & Facilities Management zawidatul 1,880 points 2 8 25
26 votes
7 answers 401 views
Di dalam perlaksanaan BIM di JKR, adakah wajar untuk pihak HODT menyerahkan softcopy reka bentuk kepada pihak kontraktor untuk memudahkan lukisan "as-built" dibuat oleh pihak kontraktor?
asked Mar 25, 2014 in BIM SarumZA 10,190 points 33 70 108
13 votes
3 answers 292 views
In designing a rainwater harvesting system if we provide tanks on the ground level, we would have to provide a proper pumping system to use the water harvested - here there is additional cost involved in providing the pumping system and also the electricity cost. There ... a separate structure (surely more expensive). Has any study been made to find out which of the system is more cost effective?
asked Mar 21, 2014 in Building harjit 7,620 points 12 29 53
10 votes
2 answers 41 views
9 votes
2 answers 310 views
11 votes
2 answers 196 views
Salam... Bagaimana JKR menyimpan dokumen atau lukisan binaan dalam jabatan supaya dapat bertahan lama dan juga boleh dikongsi bersama...dan juga untuk rujukan dimasa hadapan..??
asked Dec 4, 2013 in Project Management ssulaiman 2,020 points 3 8 9
...